54fe37fd3a93fcac0525129a11ff2b599eee5dc3
Story 51 rounding fix Acceptance criteria: - The layout must be sent over the API in a race.xml message, plus boat location messages for the marks as required, before any other boat location messages are sent. - Each mark must be defined using boat "SourceID"s (see definition of race.xml) so their positions can be adjusted later. - The course must meet the requirements given in the AC35 Protocol. - The course limits should be set to clear all marks by at least several boat-lengths. - The entire race area within the limits must be on the water. (Work with rounding) Tested by playing the first map with a variety of rotation angles. See merge request !43
SENG302 Project Template
Basic Maven project with required Maven reporting setup and basic GitLab CI.
It is a requirement that your product should be completely built to a deliverable form using the Maven package goal.
Remember to set up your GitLab CI server (refer to the student guide for instructions).
Basic Project Structure
src/Your application sourcedoc/User and design documentationdoc/examples/Demo example files for use with your application
Languages
Java
98.4%
CSS
1.6%