2ad947b57d9b3bb813c4c5cd85e632910ddad1c3
Changed the prestart time to 30 seconds (was 3 minutes). Changed the preparatory time to 10 seconds (was 1 minute). Phases: player list +prestart > warning > race view + preparatory + no more joining > started > finished.
SENG302 Project Template
Basic Maven project with required Maven reporting setup and basic GitLab CI.
It is a requirement that your product should be completely built to a deliverable form using the Maven package goal.
Remember to set up your GitLab CI server (refer to the student guide for instructions).
Basic Project Structure
src/Your application sourcedoc/User and design documentationdoc/examples/Demo example files for use with your application
Languages
Java
98.4%
CSS
1.6%